Same scope as crane 3. Boom parked at 45 degrees by the terminal for the survey.
Update job details and pilot assignments.
"STS crane 4 boom inspection" will be removed. Flights logged against it stay on the project. This cannot be undone.
"STS crane 4 boom inspection" will be moved back to Rejected with the reason below recorded on the job record.
Files specific to this job — site plans, checklists, briefings.
Files attach to job "STS crane 4 boom inspection".
Upload anything the crew needs on site — site plans, briefings, checklists.