Same scope as crane 3. Boom parked at 45 degrees by the terminal for the survey.
Update job details and pilot assignments.
"STS crane 4 boom inspection" will be removed. Flights logged against it stay on the project. This cannot be undone.
"STS crane 4 boom inspection" will be moved back to Rejected with the reason below recorded on the job record.
Gear assigned to this job. Used to track exactly what was deployed in the field.
Pick a piece of equipment from the workspace inventory.
Attach the drones, controllers, and accessories the crew needs on site.