Condition survey of the ship-to-shore cranes and quay structures at Vuosaari Harbour for the terminal operator. Flights coordinated with the terminal control room.
Update the project details below.
"Vuosaari Harbour Crane Survey" and its data will be permanently removed. This cannot be undone.
Project channel
Freeze window for crane 4 is 10:30 to 12:00. Control room is on channel 3.
It'll be replaced with a 'message deleted' placeholder for everyone in the channel.
Client wants the crane 4 report by Friday so it can go to their insurer with the crane 3 one.
Crane 4 is in Reviews now. I'll go through it this afternoon.