Condition survey of the ship-to-shore cranes and quay structures at Vuosaari Harbour for the terminal operator. Flights coordinated with the terminal control room.
Forecast and observed conditions for this project's area.
Guidance only — operator is responsible for the pre-flight check
Current conditions
Source: Open-Meteo · centroid of the project area(60.215, 25.179) · elevation 4 m· just fetched· edit area